KEY FACTS
Buyer walks away
Loses the deposit (art. 442(2))
Seller walks away
Pays back double (art. 442(2))
Alternatively
Specific performance, which a home CPCV cannot exclude (art. 830(3))
At the deed
No need to show the use licence or the ficha técnica (DL 10/2024); since 1 Oct 2026 the deed records the planning title presented or the seller’s statement that they have one or not (RJUE, art. 4-A(14))
TRY AN EXAMPLE

Scope: a CPCV for a home with a deposit and no penalty clause that changes the rules. Who failed is as you state it; in a dispute, a court decides.

WHAT HAPPENED?
Someone failed to turn up on the set deed date? That counts as delay: choose “The deed date has passed”.
THE SELLER KEEPS€25,000

Enter the price agreed in the CPCV.

Enter the amount already paid to the seller.

The amount paid cannot be higher than the price.

Enter a valid home value or leave the field blank.

Choose what happened.

The seller may keep everything it received.

Whoever paid the deposit and fails for a cause attributable to them loses it; unless the contract says otherwise, the seller cannot claim more (art. 442(2) and (4) of the Civil Code).

The buyer gets back
€0
The seller keeps
€25,000
Buyer’s balance
−€25,000
Deposit as a share of the price
10%
Specific performance (art. 830)
open to the seller

Instead of keeping the deposit, the seller may ask a court for specific performance (art. 830(3)). A written cancellation agreement can set a different outcome.

Method v1.1 · data as of 24.11.2026

The calculation stays in your browser. Nothing is sent or stored.

CPCV clause checker

Tick what your draft already contains. Under each unticked clause you see what the law says when the contract is silent.

MISSING9 / 9
MY DRAFT CONTAINS
  • Everything the buyer hands to the seller is presumed to be deposit, even if it is called a price advance (art. 441 of the Civil Code).

  • Without it, a bank refusal is not a special case: whoever fails to pay must prove it was not their fault (art. 799) and risks the deposit (art. 442(2)). A condition exists only if written down (art. 270).

  • Without a written condition (art. 270), a delay in selling your home does not pause the CPCV: the deed deadline keeps running.

  • With no deadline, either party may demand the deed at any time and, failing agreement, a court sets one (art. 777). With a set date, whoever misses it is in delay without any notice (art. 805(2)(a)).

  • The costs of the contract and ancillary costs fall on the buyer (art. 878). IMT is due from the acquirer, subject to the special rules in art. 4 of the IMT Code.

  • This is the form required for a home CPCV: in-person recognition and certification of the use or construction licence (art. 410(3)); since 1 Oct 2026, legal references to the use authorisation and licence are read as references to the prior notice or the prior notice with a time limit, as the case may be (DL 108/2026, art. 9(2)). The seller may rely on the omission only if the buyer culpably caused it; the restriction does not apply to the buyer.

  • In a home CPCV, specific performance cannot be excluded, even with a deposit (art. 830(2) and (3)). Whoever seeks it may have to deposit the unpaid price (art. 830(5)).

  • Unless agreed, there is no compensation beyond losing the deposit, double, or the value increase (art. 442(4)). A manifestly excessive penalty clause can be reduced by a court (art. 812).

  • A sale with encumbrances beyond the normal is voidable for error or fraud, where the conditions for voidability are met, and the seller must clear them (arts. 905 and 907). In specific performance, the buyer can ask for the seller to hand over the mortgage amount (art. 830(4)).

Ticks stay on this page; nothing is sent.

How this works

In a CPCV, everything the buyer hands to the seller is presumed to be deposit, even if the contract calls it a price advance (art. 441 of the Civil Code). Article 442 decides where that money goes depending on who fails; articles 804 to 808 decide when a delay becomes a failure.

  1. 1
    Add up everything you paid
    The initial deposit and any top-ups count together: in a CPCV, every amount paid to the seller is presumed to be deposit (art. 441). If the contract expressly says an amount is not a deposit, the presumption may fall and this calculation no longer fits.
  2. 2
    Work out who failed and whether it was their fault
    If whoever paid the deposit fails, the other side keeps it; if whoever received it fails, it pays back double (art. 442(2)). The law requires an attributable cause and puts the burden of proving no fault on whoever failed to perform (art. 799).
  3. 3
    Tell delay apart from non-performance
    Missing the date is delay (mora). It becomes non-performance when the creditor loses interest, judged objectively, or when a reasonable final deadline it sets is not met (art. 808).
  4. 4
    Compare with specific performance
    Instead of the deposit rules, the performing party can ask a court for a judgment that takes the place of the deed (art. 830). In a home CPCV this right cannot be excluded; whoever seeks it may have to deposit the unpaid price.

What happens to the deposit in each case

Example: a €250,000 price and €25,000 paid to the seller under the CPCV. The figures come from the same rule the calculator uses.

CASEBUYER GETS BACKSELLER KEEPSLAW
The buyer walks away€0€25,000art. 442(2)
The seller walks away€50,000€0art. 442(2)
The seller walks away, keys already handed over, home worth €300,000 on the date of the breach€50,000 or €75,000€0art. 442(2)–(3)
Loan refused, clause complied with€25,000€0arts. 270 · 442(1)
Loan refused, no clause (likely outcome)€0€25,000arts. 799 · 442(2)
Deed date passedNothing yet: delay. After art. 808, as if the late party had walked away.arts. 804 · 805 · 808
Cancellation by agreementWhat the written agreement saysart. 406

With the keys handed over, the buyer may choose between double (€50,000) and the value increase: €300,000 − €250,000 + the €25,000 deposit = €75,000 (art. 442(2)). The €300,000 is the home’s value determined objectively on the date of the breach, not today’s. The seller can block the second option by offering to complete the sale, unless the buyer has already lost interest or the final deadline it set has passed (art. 442(3) and art. 808). Wherever the contract can still be performed, the performing party may instead ask a court for specific performance (art. 830); once the home has been sold to someone else, that route needs an earlier provisional registration or a promise with real effect.

Documents to ask for before signing the CPCV

What each paper proves, where to get it officially and what to check in it. Since 1 January 2024 the deed no longer requires the use authorisation or the ficha técnica to be shown (DL 10/2024, arts. 24 and 26). Since 1 October 2026, whoever handles the deed must record in it, on pain of the sale being voidable, the planning title presented or the seller’s statement that they have one or do not have one (RJUE, art. 4-A(14), as amended by DL 108/2026). A statement is not the title: checking it with the câmara is still up to the buyer.

DOCUMENTWHAT IT PROVESWHERE, COST, VALIDITYWHAT TO CHECK
Certidão permanente (land registry certificate)Who the registered owner is, mortgages, seizures and pending registration requests.Predial Online, €15; land registry office, Loja de Cidadão or Espaço Registos, €20. Valid 6 months. You request it with your NIF and the property address. With the access code of a certificate the seller already has, viewing it is free. gov.pt ↗The sellers are the registered owners; every encumbrance has a way to be cleared by the deed.
Caderneta predial (tax record)The tax-office record: matrix article, area and taxable value (VPT).The seller gets it free on the Portal das Finanças (a Finanças office charges a fee). Valid one year or until the property changes; the code at the end lets you validate it on the Portal das Finanças. AT leaflet ↗The area and article match the certificate and the home you visited.
Use title (licence, authorisation or prior notice)That the building’s use as housing is covered by a title at the câmara municipal.The câmara municipal. Since 1 Oct 2026, use after works is by prior notice (comunicação prévia) and can start as soon as it is submitted (RJUE, art. 62-A); the use title passes automatically with the property (art. 4-A(13)). Municipal approval of use only exists since the RGEU of 7 August 1951: for older buildings, the câmara issues a certificate that construction predates it.A home CPCV must certify the use or construction licence (art. 410(3)). The deed has not required it to be shown since 1 Jan 2024 (DL 10/2024); since 1 Oct 2026 it records the title presented or the seller’s statement that they have or do not have one (RJUE, art. 4-A(14)). Checking with the câmara is still up to you.
Ficha técnica da habitação (housing technical file)The home’s technical features as built or altered.Kept by the owner; a second copy from the developer or the câmara. It does not exist for buildings from before 1951 or for those that already had a use licence, or had applied for one, when the 2004 law came in (DL 68/2004, art. 2).The deed stopped requiring it to be shown on 1 Jan 2024 (DL 10/2024); it is still the home’s technical description.
Energy certificateThe energy rating; the certificate number is written into the deed.A qualified SCE assessor. Required on sale, save the exceptions in art. 18(2), which the SCE reads as including a sale to a co-owner or to the tenant (DL 101-D/2020, arts. 18 and 31). Cost and validity →It exists and is valid before the deed.
Condominium administrator’s statementCurrent charges on the flat and any debts, with amounts and due dates.The administrator issues it within 10 days of the seller’s request (art. 1424-A of the Civil Code).It is a required deed document; if the buyer waives it, they take on the seller’s debts to the condominium.
Pre-emption rightsThat nobody with a legal pre-emption right can take the home in your place.A tenant of more than 2 years (30 days to reply), a co-owner when another co-owner’s share is sold to an outsider, an owner of an adjoining small rural plot; public bodies through the Casa Pronta notice, €15, with 10 days to reply. Casa Pronta ↗The seller notifies each holder of the sale terms before the deed (art. 416).

When the papers do not match the home

  • Area on the ground larger than in the caderneta. The deed identifies the home by the tax record and the land registry description, and accepts differences of up to 10% between those two for urban buildings (Notarial Code, art. 58); it does not measure the home. An extension that is not in the papers stays out of them after the sale; the câmara municipal says whether it was licensed.
  • Works without a licence. The deed records the title presented, or the seller’s statement that they have, or do not have, a planning title (RJUE, art. 4-A(14), since 1 Oct 2026); it does not check the works. The CPCV, on the other hand, must still certify the use or construction licence (Civil Code, art. 410(3)). After the purchase, the câmara is obliged to restore planning legality (RJUE, art. 102) and can order demolition, which is avoided if the works can be licensed or corrected; the owner has 15 days to respond first (art. 106).
  • Mortgage or seizure on the seller’s side. Encumbrances beyond the normal make the sale voidable for error or fraud, where the conditions for voidability are met, and oblige the seller to clear them (arts. 905 and 907); in specific performance the buyer may ask for the mortgage amount to be handed over (art. 830(4)).
  • Debts to the condominium. Without the administrator’s statement the deed is not complete; a buyer who waives it takes on the seller’s debts to the condominium (art. 1424-A).

The deed if you do not speak Portuguese

What the Notarial Code requires on deed day. The same rules apply to an authenticated private document signed before a lawyer or solicitor (art. 151(2)).

  • The deed is written in Portuguese. Notarial acts are written in Portuguese (art. 42(1)); that is why the interpreter translates the text aloud.
  • An interpreter of your choice. If a party does not understand Portuguese, an interpreter they choose takes part and translates the deed aloud to them and their will to the notary (art. 65(1)). Not needed if the notary speaks your language well enough to translate (art. 65(3)).
  • Who cannot interpret. Someone not of sound mind, someone who does not understand Portuguese, a non-emancipated minor, the notary office staff, the spouse or relatives in the direct line or up to the second degree of the notary or of any party, a husband and wife together, anyone gaining a financial advantage from the deed, or anyone who cannot sign (art. 68(1)). Nobody may take part in two roles at once (art. 68(2)).
  • No certified translator required. Articles 65 to 69 ask that the interpreter understands Portuguese, is not barred by art. 68 and swears an oath before the notary (art. 69); they do not require a certified translator. The notary checks suitability and may refuse an interpreter it does not find credible (art. 68(3)–(4)).
  • Foreign documents. A power of attorney or certificate in another language needs a translation, by a Portuguese notary, a consulate or a suitable translator under oath before the notary (art. 44(3)); lawyers and solicitors can also certify translations (DL 76-A/2006, art. 38).
  • What the deed records. The interpreter’s identity, their oath and a statement that these formalities were met (art. 46(1)(h)–(j)).

When this calculation does not fit

  • The contract says an amount is not a deposit, or sets a penalty clause that replaces the deposit rules (art. 442(4) allows a different agreement; art. 812 lets a court reduce a manifestly excessive penalty).
  • Off-plan purchases from a developer, a seller in insolvency, promises with real effect (art. 413) and estate divisions: other rules come into play.
  • Who failed is disputed: the code ties the outcome to an attributable cause, and in a dispute that is decided on the facts by a court.
  • For the purchase taxes and fees use the total cost of buying a home; for the whole sequence from NIF to keys, the guide to buying a home.

Frequently asked

What is a CPCV and is it compulsory?
It is the contract in which buyer and seller commit to completing the sale later (art. 410 of the Civil Code). The law regulates it but does not require it: the sale itself is what needs a public deed or an authenticated private document (art. 875). In a home CPCV, the signatures are recognised in person and the use or construction licence is certified (art. 410(3)).
How much does a CPCV cost?
The law sets no price for a CPCV. You pay for the in-person recognition of signatures; done by a lawyer or solicitor, the fee cannot exceed the notaries’ table (art. 38 of DL 76-A/2006). IMT is due at this stage only if the keys are handed over before the deed or the buyer already uses the home, except when buying your own permanent home with no assignment clause or assignment, irrevocable power of attorney or resale arrangement; or if the CPCV lets the buyer assign the contract to someone else (art. 2(2)(a) and (3) of the IMT Code).
What happens if the signatures were not recognised?
A form requirement of art. 410(3) of the Civil Code is missing (in-person recognition and licence certification). The law limits who may rely on it: the seller may raise the omission only if the buyer culpably caused it. That restriction does not apply to the buyer.
How long can pass between the CPCV and the deed?
The deadline is whatever the CPCV sets; the law sets no maximum. With no written deadline, either party may demand the deed at any time and, failing agreement, a court sets it (art. 777). With a set date, whoever misses it is in delay without notice (art. 805(2)(a)); the delay counts as non-performance when the creditor loses interest or a reasonable final deadline it sets is missed (art. 808).
Can I register the CPCV?
You can request a provisional registration of acquisition based on the CPCV, unless the contract rules it out (art. 47(4) of the Land Registry Code). It is valid for 6 months (art. 11(3)) and can be renewed for six-month periods up to one year after the deed deadline, with the parties’ consent (art. 92(4)). Once made final, it keeps the priority it had when filed (art. 6(3)): a later registration in another buyer’s name ranks behind it. The other route is giving the CPCV real effect, which requires a deed or authenticated private document and registration (art. 413 of the Civil Code).
The bank approved less than I need. Does that count as a refusal?
The law does not answer this: the wording of the financing clause decides. A clause stating the minimum amount, the deadline and which bank document counts as proof settles it; one that only mentions a loan refusal leaves it open. With no clause, the general rule applies: whoever fails to perform must prove it was not their fault (art. 799).
Can my lawyer be the interpreter at the deed?
The Notarial Code lets a party who does not understand Portuguese choose the interpreter (art. 65). Among others, it cannot be someone who does not understand Portuguese, the notary office staff, the spouse or close relatives of the notary or of the parties, anyone gaining a financial advantage from the deed, or anyone unable to sign (art. 68). Lawyers are not on that list; the notary checks suitability and may refuse anyone it does not find credible.
OFFICIAL SOURCES
DISCLAIMER
I checked these rules on 24 November 2026 against the consolidated Civil Code (arts. 441, 442, 799, 804 to 808 and 830), the Notarial Code and the Land Registry Code, DL 10/2024, the RJUE as republished by DL 108/2026 (in force since 1 Oct 2026) and the official pages linked above. It is an informational estimate, not legal advice. It assumes the contract follows the deposit regime, with no penalty clause or other term that changes it, and that whoever failed is who you say: in a dispute, fault and loss of interest are for a court to decide. It does not review drafts and does not cover a seller’s insolvency, off-plan purchases, promises with real effect or estate divisions. Before you sign or claim a deposit, check your case with a lawyer or solicitor.